Agriculture & Husbandry Solutions based on Ai & ML.
Learn more

×

QA project management

We provide reliable qa project management services for thorough testing of your product to make sure the code quality is flawless.

What do we test?

Our tests are to check every single component of the software and guarantee impeccable quality.

tild3736 3039 4637 b239 353835646336 smartphone 1 development

Mobile

tild3232 6237 4463 b635 313438616533 html 1 development

Frontend

tild6130 6330 4835 b031 346132663338 algorithm 1 development

Backend User

tild6365 6538 4630 b064 646262373839 web site 1 development

Interface

Software testing types we provide

Functional Testing

During the functional testing, we verify that each function of the software application operates according to the corresponding functional requirements. In other words, we test the business logic to make sure that the products works as it is supposed to.

Non-functional

The goal of non-functional testing is to check such non-functional aspects as reliability, usability, performance, and so on. As an example of non-functional testing imaging checking how many people can at the same time login in a software.

Unit and Integration Testing

Unit testing involves testing of small code units that represent individual functions. The purpose is to validate that every single unit of the software performs as designed.
During the integrated testing, we test the individual units that are combined and tested as a group. As a result, we can see how various components of the software interact with each other.

Smoke Testing

Smoke testing is a kind of testing that allows verifying the stability of the most important features of the software. The result of this testing is used to decide whether a build is stable enough to proceed with further testing.

Our QA management process

Requirements Validation and Test Planning
During the very first step of the software testing, our QA engineers team analyzes the project requirements. We need to get a comprehensive idea of what should be tested as well as figure out the testable requirements.
Creating the Test Plan
At the stage of test planning, we find out the effort and cost estimates for the entire project. We determine several criteria, including what aspects of testing need to be completed, how the tests will be conducted, the amount of resources for the testing phase, the amount of time, and the deadlines by which the results should be delivered.
Testing the Software
This is the actual testing process, where our QA teams start testing the functionality that was implemented during each sprint. The goal of this stage is to make sure all the bugs are found, all the bug reports for the developers are made, and all the features work properly.
Test Closure and Reporting
The bugs identified during the software testing stage are put by us in a bug tracking system. Using this system, we can easily track issues of any level as well as all keep team members udated on task resolution in real time. As soon as we’ve finished with the testing stage, we form a sign-off report to our client, describing the test results.

Tools we use

tild6234 3234 4162 b761 393235646333 Frame 27 development

Postman

tild3334 3331 4331 b638 386430303766 Frame 28 development

Firebase fabric

tild3161 6132 4836 b331 323661306363 Frame 35 development

Charles Proxy

tild6463 3638 4536 b332 663032646465 Frame 34 development

Browser's Developer Tools

tild3535 3230 4466 a261 633031636265 Frame 33 development

IntelliJ IDEA

tild3830 3736 4637 b234 663135333638 Frame 30 development

Java

tild3964 6132 4166 b837 393032373736 Frame 36 development

Gradle

tild6536 6564 4230 b663 303463363439 Frame 29 development

Maven

tild3434 3339 4533 b736 643762376134 Frame 37 development

Selenide

tild6266 6538 4462 b839 633730373931 Frame 32 development

Selenoid

tild3038 3032 4464 b832 366337653264 Frame 31 development

GitHub

tild6438 6463 4636 a532 646161313430 Frame 26 development

CircleCI

Let's build great things together

After you fill out this from, one of our client success managers will contact you within 24 hours. We have three types of notifications set to make sure your message is received.

By submitting request you agree to our Privacy Policy